```php Integration of the Failure Mode and Effect Analysis Method with the Fuzzy Analytic Hierarchy Process to Assess Risks and Determine the Priority of Failure Mode: An Applied Research | Abstract IJTBM

International Journal of Transformations in Business Management

International Peer Reviewed (Refereed), Open Access Research Journal

E-ISSN : 2231-6868 | P-ISSN : 2454-468X

IMPACT FACTOR : 5.987 | SJIF 2020: 6.336 | ICV 2020=66.47

+91 9555269393 | +91 9311631393   info@ijtbm.com


Abstract

Integration of the Failure Mode and Effect Analysis Method with the Fuzzy Analytic Hierarchy Process to Assess Risks and Determine the Priority of Failure Mode: An Applied Research

Mohammed Sabah Hamad

Harith Yarub Maan

82-99 Vol: 11, Issue: 1, 2021
Receiving Date: 2021-01-18
Acceptance Date: 2021-03-02
Publication Date: 2021-03-18
Download PDF

Abstract

In this research, the failure modes and effect analysis (FMEA) and the fuzzy analytic hierarchy
process (FAHP) were used in order to help identify and evaluate the risks of known and / or
potential failure modes in the boiler in the General Company for Textile and Leather Industries
in order to eliminate or reduce their impact. The traditional FMEA method determines the risk
priority number (RPN) by multiplying the three risk factors (severity, occurrence, and
detection). However, this method has been criticized a lot because it contains many defects or
limitations. For example, it does not take into account the relative importance of the three risk
factors. The (FAHP) technique was used to determine the relative importance of risk factors as
well as to overcome the uncertainty problem. The proposed integration model helps increase
accuracy in prioritizing the risk of failure modes by eliminating the disadvantages of the
conventional method.

Keywords: FMEA; FAHP; RPN; S, O, D, Risk Assessment

References

  1. Carlson, C. (2012). "Effective FMEAs: Achieving safe, reliable, and economical products and processes using failure mode and effects analysis", (Vol. 1). John Wiley & Sons.
  2. AHMED, A. M., & MAHMOUD, M. (2014),"Composite FMEA for risk assessment in the construction projects based on the integration of the conventional FMEA with the method of pairwise comparison and Markov chain", Submitted in partial fulfillment of the requirements for the degree og master of science in management engineering.
  3. Okoro, U., Kolios, A., & Cui, L. (2016). "Multi-criteria risk assessment approach for components risk ranking–The case study of an offshore Wave Energy Converter". International journal of marine energy.
  4. Chanamool, N., & Naenna, T. (2016). "Fuzzy FMEA application to improve decision-making process in an emergency department". Applied Soft Computing, 43, 441-453.
  5. Chang, K. H. (2016). "Generalized multi-attribute failure mode analysis". Neurocomputing, 175, 90-100.
  6. Kutlu, A. C., & Ekmekçioğlu, M. (2012). "Fuzzy failure modes and effects analysis by using fuzzy TOPSIS-based fuzzy AHP". Expert Systems with Applications, 39(1), 61-67.
  7. Wang, Y. M., Chin, K. S., Poon, G. K. K., & Yang, J. B. (2009). "Risk evaluation in failure mode and effects analysis using fuzzy weighted geometric mean". Expert systems with applications, 36(2), 1195-1207.
  8. Renu, R., Visotsky, D., Knackstedt, S., Mocko, G., Summers, J. D., & Schulte, J. (2016). "A knowledge based FMEA to support identification and management of vehicle flexible component issues". Procedia Cirp, 44, 157-162.
  9. Liu, H. C. (2016). "FMEA Using Uncertainty Theories and MCDM Methods". Springer.
  10. Ben-Daya, M., Duffuaa, S. O., Raouf, A., Knezevic, J., & Ait-Kadi, D. (Eds.). (2009). "Handbook of maintenance management and engineering", (Vol. 7). London: Springer London.
  11. Al-Khafaji, S. K. H., Al-Rahman, N. M., & Al-Dauod, Z. I. A. (2005). "Design of a Programmable System for Failure Modes and Effect Analysis of Steam-Power Plant Based on the Fault Tree Analysis". Al-Khwarizmi Engineering Journal, 1(2), 64-85.
  12. Kudláč, Š., Štefancová, V., & Majerčák, J. (2017). "Using the Saaty Method and the FMEA Method for Evaluation of Constraints in Logistics Chain". Procedia Engineering, 187, 749- 755.
  13. McDermott, R. E., Mikulak, R. J., & Beauregard, M. R. (2009). "The Basic of FMEA". New York: Taylor & Francis Group.
  14. Zadeh, L. A. (1965). "Fuzzy sets, Information and control", 8(3), 338-353.
  15. Bowles, J. B., & Peláez, C. E. (1995)." Fuzzy logic prioritization of failures in a system failure mode, effects and criticality analysis". Reliability Engineering & System Safety, 50(2), 203- 213.
  16. Ambekar, S. B., Edlabadkar, A., & Shrouty, V. (2013). "A review: implementation of Failure Mode and Effect Analysis". International Journal of Engineering and Innovative Technology, 2(8), 37-41.
  17. Saaty, T.L., (1988), "What is the Analytic hierarchy process?", Mathematical Models, Vol. F48.
  18. Chan, H. K., & Wang, X. (2013). "Fuzzy hierarchical model for risk assessment". London: Springer, 10, 978-1.
  19. Weck, M., Klocke, F., Schell, H., & Rüenauver, E. (1997). "Evaluating alternative production cycles using the extended fuzzy AHP method". European Journal of Operational Research, 100(2), 351-366.
  20. Arshinder, Kanda, A., & Deshmukh, S. G. (2007). "Coordination in supply chains: an evaluation using fuzzy logic". Production Planning & Control, 18(5), 420-435.
  21. Huang, C. C., Chu, P. Y., & Chiang, Y. H. (2008). "A fuzzy AHP application in governmentsponsored R&D project selection". Omega, 36(6), 1038-1052.
  22. Wang, X., Li, D., & Shi, X. (2012). "A fuzzy model for aggregative food safety risk assessment in food supply chains". Production Planning & Control, 23(5), 377-395.
  23. Buckley, J. J. (1985). "Fuzzy hierarchical analysis". Fuzzy sets and systems, 17(3), 233-247.
  24. Van Laarhoven, P. J., & Pedrycz, W. (1983). "A fuzzy extension of Saaty's priority theory". Fuzzy sets and Systems, 11(1-3), 229-241.
  25. . Chang, D. Y. (1996). "Applications of the extent analysis method on fuzzy AHP". European journal of operational research, 95(3), 649-655.
  26. Naghadehi, M. Z., Mikaeil, R., & Ataei, M. (2009). "The application of fuzzy analytic hierarchy process (FAHP) approach to selection of optimum underground mining method for Jajarm Bauxite Mine, Iran". Expert Systems with Applications, 36(4), 8218-8226.
  27. Emrouznejad, A., & Ho, W. (2017). "Fuzzy Analytic Hierarchy Process" (1st ed.). CRC Press.
  28. Ayhan, M. B. (2013). "A fuzzy AHP approach for supplier selection problem: A case study in a Gear motor company". arXiv preprint arXiv:1311.2886.
  29. Ilangkumaran, M., Shanmugam, P., Sakthivel, G., & Visagavel, K. (2014). "Failure mode and effect analysis using fuzzy analytic hierarchy process". International Journal of Productivity and Quality Management, 14(3), 296-313.
  30. Moslem, S., Ghorbanzadeh, O., Blaschke, T., & Duleba, S. (2019). "Analysing stakeholder consensus for a sustainable transport development decision by the fuzzy AHP and interval AHP". Sustainability, 11(12), 3271.
Back

```